Compensated gross tonnage

Indicator of the amount of work necessary to build a ship

Compensated Gross Tonnage (CGT) is an indicator of the amount of work that is necessary to build a given ship and is calculated by multiplying the tonnage of a ship by a coefficient, which is determined according to type and size of a particular ship.

The standard CGT system was developed in 1977 by the OECD so that inter-country shipbuilding output could be reasonably compared, as different types of ships require a greater or lesser degree of work relative to their gross tonnage. For example, passenger ferry of a given size would require substantially more work to build than a bulk carrier of the same size due to the differing design requirements, internal structure, and required level of detail, but simply comparing the gross tonnage or deadweight of each ship would incorrectly show that they took the same amount of work. When expanded on a national scale, this difference could greatly mislead people as to the actual maritime production capacity of a given country.

The formula to calculate CGT was revised by the OECD in 2007.

References

Stopford, Martin (1997). Maritime Economics (2nd ed.). Routledge. pp. 525–526. ISBN 978-0-415-15309-6.

External links

  • OECD: CGT system 2007 Revision of 2007 and calculation formula
  • v
  • t
  • e
  • v
  • t
  • e
Ship measurements
Length
  • Length overall
  • Length between perpendiculars
  • Length at the waterline
Breadth
  • Beam
Depth
  • Draft
  • Moulded depth
  • Freeboard
  • Waterline (Plimsoll Line)
  • Under keel clearance
Height
  • Air draft
Volume
Worldwide
  • Tonnage
  • Gross tonnage
  • Compensated gross tonnage
  • Net tonnage
Specialized
  • Panama Canal/Universal Measurement System
  • Thames measurement tonnage
Archaic
  • Gross register tonnage
  • Net register tonnage
Capacity
Current
Archaic
Weight
  • Displacement
  • Loaded displacement
  • Standard displacement
  • Light displacement
  • Normal displacement
Stability
Limits